Precision Infratech Ltd.  
 

Current Projects

 
 
Page : 1 | 2  
 

Shrinagar HE Project

 
Name
:
Shrinagar HE Project
Location
:
Tehri, Pauri, Uttarkhand.
Project Owner
:
M/s. Alakhanda Hydro Power Company Ltd.
Value of Work ( in lakhs)
:
8000
Year of Commissioning
:
2011
Brief Description
:
8 Nos.Spillway Radial Gates with Hydraulic Hoist,1 set of spillway stoplog with 1 No.  Gantry Crane,6 Nos. HRT Intake Gate with Hydraulic Hoists, 3 sets of HRT Intake stoplog  with 1 No.Gantry Crane, HRT Intake Trash Rack, 12 sets Riparian Outlet Trash Screen,  stoplog, slide Gate, 1 No. TRCM for HR intake, 2 nos. Desilting Basin Flushing Gates with  Rope drum Hoist, 1 set of Desilting Basinb Isolating stoplog with 1 No. Gantry Crane, 3  Nos.By Pass Automatic regulating Gates with Hydraulic Hoist, 1 No. Overhead Travelling  Crane for flushing Gate control Building.4 Nos. Forebay Intake Gate with Hydraulic Hoist,  1 set of Forebay Intake stoplog, Forebay intake trashrack with Gantry Crane, 6 Nos. of  Draft tube Gates with Gabtry Crane & 1 No. TRCM for Forebay Intake.
 

Nagarjuna Sagar Tail Pond Dam Project

 
Name
:
Nagarjuna Sagar Tail Pond Dam Project
Location
:
Satrasala, Guntur Dist, Andhra Pradesh.
Project Owner
:
APGENCO
Value of Work ( in lakhs)
:
150.5
Year of Commissioning
:
2009
Brief Description
:
Fabrication and Erection of Penstock steel liners.
 

Lower Tapi Project

 
Name
:
Lower Tapi Project
Location
:
Dist. Jalgaon, Maharashtra.
Project Owner
:
TIDC
Value of Work ( in lakhs)
:
8188.91
Year of Commissioning
:
2016
Brief Description
:
23 Nos. Radial Gates and stoplog Gates &Goliath Crane Including sand blasting and  painting.
 
 
Go To Top Page : 1 | 2  
 
Koteshwar Project
Myntudu Leshka Tailpond Penstock

 

 
 
 
   
  Copyright 2009 Precision Infratech & Engineering Ltd.